Operations
Your workmanship warranty: what to put in writing before the job
By Avery Lindqvist, Staff Writer6 min read

“We stand behind our work” is not a warranty
A spoken promise means different things to you and the customer.
You usually mean, “If my install fails, I fix it.” The customer may hear, “Anything that goes wrong with that room, forever.”
That gap creates warranty arguments. It also creates calls your office cannot answer the same way twice.
A written workmanship warranty turns the promise into a short list. It tells the customer what is covered, how long the coverage lasts, what is excluded, and how to report a problem.
Write it before the job starts. Hand it over with the contract. Do not wait until the customer calls with a complaint.
This article is about writing the warranty terms. It is not about handling an angry complaint call. That is a separate process covered here.
Your labor warranty is not the product warranty
Your workmanship warranty covers your labor and how the work was installed.
A product warranty covers the material. Shingles, faucets, flooring, windows, and appliances may each have a manufacturer warranty with its own terms.
Say both in writing.
Give the customer the manufacturer paperwork at closeout. If the product requires registration, tell the customer that registration exists and state who is responsible for doing it.
Your warranty should not make a manufacturer promise sound like your own promise. It should also not leave the customer guessing about which document applies when a faucet leaks or a window part fails.
Pick one warranty length and one start date
There is no single right warranty length for every trade or job. The length depends on the work.
The important part is that you choose a length and write it down.
Write the start date too. It could be the date of final payment or the date of the final walkthrough. Pick the point that fits your process, then use it consistently.
The warranty length should be the same on every job of that type. That gives your office one answer when a customer calls. It also keeps the written terms from changing based on who sold the job or who answers the phone.
Your warranty should say exactly when coverage starts and when it ends. Do not make the customer calculate it from a vague phrase such as “for a reasonable period.”
Cover defects in your workmanship
State the covered problem in plain English: defects in your workmanship.
Then give examples that match your trade.
A leaking joint you made is a workmanship problem. Trim that pulls loose because it was not fastened correctly is a workmanship problem. Flooring that lifts because of how it was installed is a workmanship problem.
The warranty covers the work you performed. It does not turn every later problem in the area into your responsibility.
That distinction belongs in the written terms, not in a debate after the customer has already called.
List the problems the warranty does not cover
Your exclusions list should be short and direct. Include:
- Normal wear and tear.
- Damage from misuse or accidents.
- Changes or repairs made by the customer.
- Work by other people after you leave, including the customer’s own repairs in that same area.
- Materials supplied by the customer. Explain that boundary in your material terms and point customers to your customer-supplied materials policy.
- Problems with existing work that was already there before you started. That includes conditions left by another contractor, including the situation covered in this article.
House movement needs its own line.
Small hairline cracks in drywall or caulk joints can appear as a house moves. Wood can develop seasonal gaps. Doors can stick a little when humidity changes.
A very common warranty call comes many months after the job, around the first big change of season. The customer says, “The door you hung is sticking,” or, “There is a crack above the doorway you framed.”
Without written terms, two people remember a handshake differently. With written terms, the office reads the line about seasonal movement and books the touch-up visit. The call takes a few minutes.
If you want to handle these items with a free touch-up visit within the warranty period, say that in writing. The customer should know what you will do before the issue appears.
Tell customers exactly how to report a problem
Your warranty should state who the customer calls and which number to use. It should say that a photo helps and how fast you will get back to them.
Separate urgent problems from routine ones.
An active water leak or a safety issue gets a same-day response. A hairline crack can wait for a scheduled visit.
That does not mean every urgent report is covered. It means your response time is clear.
A customer with water coming through a ceiling needs to know what happens next. A customer reporting a small finish crack needs a different expectation. Put both instructions in the warranty and give the office the same instructions.
Inspect before you decide what to do
Write this sentence into your terms: “We inspect before we decide.”
You look at the problem first. Then you decide whether the right action is repair, replacement, or a finding that the issue is not covered.
If it is not covered, give the reason.
This prevents a customer from treating a phone call as an instant approval. It also gives you room to review the job file, inspect the area, and compare the problem with the warranty terms.
Your receptionist can take the report. Your team makes the warranty decision.
Keep the promise in the job file
Write the warranty start date in the job file. Keep the before and after photos from the job. Use the same file process for a roof, a painted room, a deck, a plumbing repair, or an electrical installation.
Your job-site photos can answer basic questions when a warranty call comes in:
- When did we do the work?
- What did we do?
- What did we promise?
Give the warranty to the customer with the contract. Give it again with the final invoice or at the final walkthrough. The final payment process is another chance to put the terms in front of the customer, as covered in this payment guide.
Walk through the not-covered list in person. Use a calm voice. Do it before anyone needs the warranty.
Bella can take the call while you are working
Warranty calls often come in while you are on another job.
Bella, the Nail the Call receptionist, answers every call, day or night, including weekends and holidays. She asks what the problem is and where it is. She takes the details and texts you a summary right after the call with the customer’s name, number, address, and description.
She knows which calls are urgent. Water coming through a ceiling gets you a text right away. A small crack can wait.
On the Growth plan, Bella has full repeat-caller memory. A past customer does not have to explain who they are or what job you did.
Bella does not decide whether something is covered. She does not promise a repair. She does not guess at technical questions. She writes the details down for you. You make the warranty decision.
You can change what she tells callers at any time. Call (628) 895-9788. Pricing is flat per month: Starter is $95, Growth is $295, and Pro is $495. There are no per-call limits, no per-minute meter, and no overage fees.
Do not promise more than you can honor
Avoid “lifetime” and “guaranteed forever” unless you are prepared to honor those promises for as long as you are in business.
A shorter warranty that you always honor builds more trust than a large promise you argue about.
State law may give customers rights beyond what you write. Some states have implied warranty rules. Some trades and contract types have their own rules. A written warranty may not remove those rights.
Have a local lawyer review your warranty wording once. Then use the same wording on every job of that type.
Write these lines before the next job
Before you send the next contract, write down:
- The warranty length and start date.
- What workmanship is covered.
- The exclusions, including house movement.
- Who handles product warranty paperwork and registration.
- Who the customer calls, which number to use, and what response time applies.
- The difference between urgent and routine reports.
- “We inspect before we decide.”
- What goes into the job file, including the start date and before and after photos.
- That a local lawyer reviewed the wording.
Then attach the warranty to the contract and hand it over again at the final walkthrough or with the final invoice.
Keep reading
- Paying subs in 2026: the 1099-NEC line moved from $600 to $2,000The federal 1099-NEC line for paying subs went from $600 to $2,000 for 2026 payments. You will file fewer forms. You still need the W-9 before the first check.
- The after-hours call policy every contracting shop needsDecide which calls are worth answering at night, who they go to, and what happens to the rest.
- Allowances in an estimate: how to write them so they don't turn into a fightThe estimate said "tile allowance" and a number. Then the customer came back from the showroom. How to write allowances so the overage, the labor, and the deadline are settled before anyone signs.
- Asking for reviews and referrals: when to ask, how to ask, and what not to doThe best time to ask for a review is the final walkthrough, in person, with a link in a text the same day. Here is the full habit, plus the review rules that trip shops up.
- Collecting the final payment: how to get paid in full when the job is doneThe final check rarely stalls because the customer cannot pay. It stalls over one small item nobody wrote down. Here is how to close out a job and leave with the money.
- The unhappy customer call: how to handle a complaint after the job is doneMost complaint calls are about something small. Silence is what makes them expensive. Call back the same day, sort the problem, and book a real return date.
- What your crew needs to know before the first morning: the handoff from the person who sold the jobThe person who sold the job heard the whole story. The crew lead got part of it. A one-page handoff before day one closes that gap.
- The customer wants to buy their own materials: how to say yes without eating the riskCustomer-supplied materials can work, but only with rules set before the job: approve the product, check the boxes before the start day, warrant your labor only, and set a charge for lost days.
- The EPA lead paint rule: what every trade needs to know about pre-1978 homesThe trigger is the age of the house and how much paint you disturb, not your trade. Ask what year it was built before you book.
- Why customers stand you up on estimate visits, and how to stop itMost no-shows are booking problems, not customer problems. Fix the booking call and the days before the visit.
- 'I'm getting three quotes': how to answer the caller who is shopping aroundGetting several quotes is normal homework, not an insult. Ask what was missing from the others, book the visit on the first call, and write a quote that is easy to compare line by line.
- Should you give a price over the phone? How to answer 'what will it cost?'Give a range when a few questions and photos can get you close, book a visit when the price hides behind a wall, and write down every number you say.
- How long should an estimate stay good? Setting an expiration date when material prices moveA quote with no end date promises your price and your calendar forever. One line on the estimate fixes that, and it keeps you from an awkward call weeks later.
- How many times to follow up with a lead before you let it goA follow-up schedule that keeps slow leads alive without turning you into the shop that will not stop calling.
- How to spot a tire kicker on the phone, before you drive outThe signals that separate a serious customer from someone collecting numbers, and how to handle both.
- How to turn down a job without burning the leadHow to say no to the wrong job so the caller still remembers you well when the right job comes along.
- Job photos: what to shoot before, during, and after every jobThe shop with a before photo of that crack can text it back and the call ends calmly. The shop without one argues from memory. Here is the photo habit that settles it.
- The 'my last contractor walked off the job' call: how to take over half-finished workTakeover jobs can be good work. Ask about the old contract, the money, and the permit on the first call, never price them over the phone, and write down what you own.
- 'Are you licensed and insured?': how to answer it on the phoneThe question often comes right before the caller hangs up. Answer it in one specific sentence, name the coverage you carry, and text proof before they put the phone down.
- Markup vs margin: why a 20 percent markup is not a 20 percent profit"I put 20 percent on everything" sounds like a 20 percent profit. It is not. Here is the math from the margin you need to the markup you charge, and what a discount really costs.
- Order the materials before you promise the start dateThe start date you give a customer is only as good as your slowest material. Here is how to confirm lead times, order early, and catch a wrong delivery before it stops the crew.
- The nine questions to ask on every remodel callGet budget, scope, and timeline out of a first call without making it feel like an interrogation.
- Should you charge for estimates? A straight answer for contractorsWhen charging wins you better work, when it costs you jobs, and how to introduce a fee properly.
- When your sub doesn't show up: how to protect the schedule and the customer's trustThe customer finds the empty house before you hear about it. How to confirm subs, build slack into the schedule, and tell the customer first when a trade misses a day.
- 3-day right to cancel for contractors: the FTC Cooling-Off RuleThe contractor's 3-day right to cancel: what to hand over at the kitchen table, when you can cash the deposit, and when the rule does not apply.
- Voicemail, answering service, or receptionist: what actually fits a contracting shopAn honest comparison of the three ways to handle calls you cannot take, including where each one fails.
- Rain day: what to tell the customer when weather pushes the job backThe customer is almost never upset that it rained. They are upset that they had to call to find out. Here is how to make the weather call first.
- What a missed call actually costs your contracting businessWork out the real number for your own shop, using jobs you have already booked this year.
- When can you start? How to answer when you're booked weeks outThe hopeful date and the flat 'we're booked out' both lose jobs. Separate the visit date from the start date, tie the range to your real calendar, and tell a wrong-fit caller early.
- While you're here: how to handle extra work requests without eating the costHow to price and write up the small add-ons customers ask for mid-job, so nobody is surprised at the final invoice.
- Working in a lived-in home: the house rules and daily cleanup that keep the customer on your sideMost mid-job calls are not about the work. They are about the dog that got out, the truck in front of the neighbor's mailbox, and the dust on the dining table. Here is how to stop those calls before they start.
- Raising your prices: how to tell past customers without losing themThe hard part of a price increase is the repeat customer who calls and says "same as last time." How to pick a start date, send a short heads-up, and hold the new price calmly.
See it in action
Book a short walkthrough and we’ll show you Bella taking a call for a shop like yours.
Book a walkthrough
15 minutes, no pitch deck.
Or just call us
(628) 895-9788