Pricing
Raising your prices: how to tell past customers without losing them
By Holden Marsh, Editorial Director6 min read

Four signs your price is too low
Your calendar is booked far out, but you still say yes to almost everything.
You win almost every bid you send.
You check a finished job against the estimate and find that the profit is thinner than planned.
Your material and labor costs went up since you last changed your price.
Any one of these can start the conversation. Together, they make the decision plain. Your old price is no longer doing its job.
New customers are the easy part. They never saw the old price. Put the new price on every estimate from a set date.
The hard part is the customer who has hired you before. That customer remembers what you charged. Sometimes they remember the old number better than you do.
Pick one date and protect every old agreement
Choose the date when the new prices begin. Then use that date everywhere.
Everything signed before the date keeps its price. Estimates already sent stay good until the expiration date written on them. Do not change the price on a signed contract. Do not change it on a job already in progress.
This gives you a clean line. Your team knows which price applies. Your customer knows what they agreed to. You do not have to make a new decision every time someone calls.
The call that tests a price increase is almost never a stranger. It is the past customer who says, “same as last time.”
In their head, “same” means the same job and the same price. If you have not told them the price changed, the call starts with a let-down. If you told them weeks ago, the call is just a booking.
Tell repeat customers before they ask for the old price
Send a short message before the start date. Use a text, an email, or a line on the next estimate.
Say three things:
“Prices change on the first of next month. Costs have gone up, and this change lets us keep doing the job right. Thank you for being a repeat customer.”
That is enough. You do not need a long apology. You do not need to explain every material bill, payroll cost, or decision behind the change.
The customer needs the new price, the date, and one plain reason. Give them those facts before they call.
Give your best repeat customers a short heads-up window too. Tell them anything they book before the change date gets the current price. That is a thank-you, not a discount. It can also fill the calendar before the new price starts.
Put the message in the job file. Record which customers received it and when. If a customer calls later, you can see what they were told.
A quiet invoice increase creates the wrong fight
Do not raise the price quietly on an invoice.
A customer who sees a bigger number with no warning feels tricked, even if the new price is fair. The surprise is what loses the customer, not the price.
This applies to every place the old price appears. Change your estimate templates, the website if prices are listed there, price sheets in the truck, and what the office tells callers on the same day.
Update the answers your phone receptionist gives too. One old price hiding in one place can cause the worst call. A customer may hear the old range from one source, schedule the work, and then see the new number later.
The date must mean the same thing in your office, on your website, in your truck, and on the phone.
Say the new price once when a past customer pushes back
A past customer may say the old price is what they paid before. They may ask you to keep it that way.
Say the new price once. Give the one-sentence reason. Stay calm. Do not argue. Do not cave on the spot.
If the budget is the problem, offer a smaller scope instead of cutting the price. Do part of the job now and part later. A plumber might handle the urgent portion first. A painter might split the work into separate phases. A remodeler might complete one area before starting the next.
The scope changes. The price for the work does not become an argument.
If the customer leaves, let them leave politely. A customer who only stays at the old price was not a profitable customer.
That does not mean you should be rude or dismissive. Thank them for the past work. Leave the door open. Do not promise the old price will return.
Raise prices on a habit, not after years of silence
Do not wait until costs have climbed for years and then make one big jump.
Raise prices in steps and on a habit. Review them once a year in the same month. A regular small change is easier to explain than a big change after a long silence.
The habit also removes some of the emotion. You are not reacting to one difficult month. You are reviewing the price as part of running the shop.
Set the review month. Check whether you are booked far out, winning almost every bid, seeing thinner profit than planned, or paying more for material and labor. Then set the next change date and update your customer message.
Bella can give callers the new range after you change it
Nail the Call’s receptionist is Bella, an AI receptionist. She answers every call 24/7. She can give the price range you set, and she will never quote a number you did not approve.
Your price ranges are part of setup. You can change her answers any time. On the day your new prices start, update her range once. Every caller hears the new range from then on.
On the Growth plan, Bella has full repeat-caller memory. A repeat customer does not have to explain who they are again, and the job details land in the text summary you get after every call.
Bella does not set your prices, negotiate, send the heads-up message to past customers, or decide discounts. You make those decisions.
Starter is $95 per month. Growth is $295 per month. Pro is $495 per month. Each plan is flat, with no per-call limits, no per-minute meter, and no overage fees. Call (628) 895-9788.
Put the price change on this checklist
- Pick one date when the new prices start.
- Keep the old price on signed contracts, active jobs, and estimates until their written expiration date.
- Send repeat customers a short heads-up before the date.
- Offer your best repeat customers the current price if they book before the change date.
- Update templates, website prices, truck price sheets, office instructions, and phone answers on the same day.
- Record who received the message and when in the job file.
- Update Bella’s approved price range on the start date if you use Nail the Call.
Keep reading
- Paying subs in 2026: the 1099-NEC line moved from $600 to $2,000The federal 1099-NEC line for paying subs went from $600 to $2,000 for 2026 payments. You will file fewer forms. You still need the W-9 before the first check.
- The after-hours call policy every contracting shop needsDecide which calls are worth answering at night, who they go to, and what happens to the rest.
- Allowances in an estimate: how to write them so they don't turn into a fightThe estimate said "tile allowance" and a number. Then the customer came back from the showroom. How to write allowances so the overage, the labor, and the deadline are settled before anyone signs.
- Asking for reviews and referrals: when to ask, how to ask, and what not to doThe best time to ask for a review is the final walkthrough, in person, with a link in a text the same day. Here is the full habit, plus the review rules that trip shops up.
- Collecting the final payment: how to get paid in full when the job is doneThe final check rarely stalls because the customer cannot pay. It stalls over one small item nobody wrote down. Here is how to close out a job and leave with the money.
- The unhappy customer call: how to handle a complaint after the job is doneMost complaint calls are about something small. Silence is what makes them expensive. Call back the same day, sort the problem, and book a real return date.
- What your crew needs to know before the first morning: the handoff from the person who sold the jobThe person who sold the job heard the whole story. The crew lead got part of it. A one-page handoff before day one closes that gap.
- The customer wants to buy their own materials: how to say yes without eating the riskCustomer-supplied materials can work, but only with rules set before the job: approve the product, check the boxes before the start day, warrant your labor only, and set a charge for lost days.
- The EPA lead paint rule: what every trade needs to know about pre-1978 homesThe trigger is the age of the house and how much paint you disturb, not your trade. Ask what year it was built before you book.
- Why customers stand you up on estimate visits, and how to stop itMost no-shows are booking problems, not customer problems. Fix the booking call and the days before the visit.
- 'I'm getting three quotes': how to answer the caller who is shopping aroundGetting several quotes is normal homework, not an insult. Ask what was missing from the others, book the visit on the first call, and write a quote that is easy to compare line by line.
- Should you give a price over the phone? How to answer 'what will it cost?'Give a range when a few questions and photos can get you close, book a visit when the price hides behind a wall, and write down every number you say.
- How long should an estimate stay good? Setting an expiration date when material prices moveA quote with no end date promises your price and your calendar forever. One line on the estimate fixes that, and it keeps you from an awkward call weeks later.
- How many times to follow up with a lead before you let it goA follow-up schedule that keeps slow leads alive without turning you into the shop that will not stop calling.
- How to spot a tire kicker on the phone, before you drive outThe signals that separate a serious customer from someone collecting numbers, and how to handle both.
- How to turn down a job without burning the leadHow to say no to the wrong job so the caller still remembers you well when the right job comes along.
- Job photos: what to shoot before, during, and after every jobThe shop with a before photo of that crack can text it back and the call ends calmly. The shop without one argues from memory. Here is the photo habit that settles it.
- The 'my last contractor walked off the job' call: how to take over half-finished workTakeover jobs can be good work. Ask about the old contract, the money, and the permit on the first call, never price them over the phone, and write down what you own.
- 'Are you licensed and insured?': how to answer it on the phoneThe question often comes right before the caller hangs up. Answer it in one specific sentence, name the coverage you carry, and text proof before they put the phone down.
- Markup vs margin: why a 20 percent markup is not a 20 percent profit"I put 20 percent on everything" sounds like a 20 percent profit. It is not. Here is the math from the margin you need to the markup you charge, and what a discount really costs.
- Order the materials before you promise the start dateThe start date you give a customer is only as good as your slowest material. Here is how to confirm lead times, order early, and catch a wrong delivery before it stops the crew.
- The nine questions to ask on every remodel callGet budget, scope, and timeline out of a first call without making it feel like an interrogation.
- Should you charge for estimates? A straight answer for contractorsWhen charging wins you better work, when it costs you jobs, and how to introduce a fee properly.
- When your sub doesn't show up: how to protect the schedule and the customer's trustThe customer finds the empty house before you hear about it. How to confirm subs, build slack into the schedule, and tell the customer first when a trade misses a day.
- 3-day right to cancel for contractors: the FTC Cooling-Off RuleThe contractor's 3-day right to cancel: what to hand over at the kitchen table, when you can cash the deposit, and when the rule does not apply.
- Voicemail, answering service, or receptionist: what actually fits a contracting shopAn honest comparison of the three ways to handle calls you cannot take, including where each one fails.
- Rain day: what to tell the customer when weather pushes the job backThe customer is almost never upset that it rained. They are upset that they had to call to find out. Here is how to make the weather call first.
- What a missed call actually costs your contracting businessWork out the real number for your own shop, using jobs you have already booked this year.
- When can you start? How to answer when you're booked weeks outThe hopeful date and the flat 'we're booked out' both lose jobs. Separate the visit date from the start date, tie the range to your real calendar, and tell a wrong-fit caller early.
- While you're here: how to handle extra work requests without eating the costHow to price and write up the small add-ons customers ask for mid-job, so nobody is surprised at the final invoice.
- Working in a lived-in home: the house rules and daily cleanup that keep the customer on your sideMost mid-job calls are not about the work. They are about the dog that got out, the truck in front of the neighbor's mailbox, and the dust on the dining table. Here is how to stop those calls before they start.
- Your workmanship warranty: what to put in writing before the jobA spoken promise turns into an argument months later. How to write a short workmanship warranty: one length, one start date, a plain not-covered list, and an inspect-first rule.
See it in action
Book a short walkthrough and we’ll show you Bella taking a call for a shop like yours.
Book a walkthrough
15 minutes, no pitch deck.
Or just call us
(628) 895-9788