Sales
'I'm getting three quotes': how to answer the caller who is shopping around
By Holden Marsh, Editorial Director7 min read

TL;DR: When a caller says, “I’m getting three quotes,” do not cut your price or get defensive. Ask where they are in the process, when they plan to decide, who decides, and then book the visit while you have them on the phone.
A caller who says, “I’m getting a few quotes,” is usually telling you how they plan to buy. They are not necessarily rejecting you. They are not necessarily asking for your lowest price.
Many homeowners hear the same advice: get more than one quote. It is sensible advice. A caller who says it out loud is often a real buyer doing their homework.
That is different from the price shopper who only wants a number and will not describe the job. Your first job is to find out which caller you are speaking with.
“I’m getting three quotes” is not an insult
Some owners hear that sentence as a warning. Others hear it as a challenge and start cutting the price before they have seen the roof, bathroom, panel, fence, or whatever the caller needs.
Both reactions hurt you.
You do not know the job yet. You do not know what the customer values. You do not know whether the other quotes describe the same work. A lower number on the phone tells you almost nothing.
Treat the sentence as useful information instead.
Start with this:
“That makes sense. Where are you in the process?”
Then ask:
“Is this your first call, or are you near the end?”
“Has anyone already been out?”
These answers tell you whether you are helping the customer start their search or trying to earn the last spot on the list.
Ask what was missing, not what it cost
If another contractor has already visited, do not lead with, “What did they charge?”
Ask what the caller liked and what was missing.
They may say the other contractor was fast. They may want clearer communication. They may care about cleanliness, someone who calls back, or a visit that happens when promised.
That answer tells you what this customer actually cares about.
Find the decision date before you leave the call
Ask, “When do you plan to decide?”
Then ask, “Who is making the decision?”
If two people decide, try to have both at the visit.
The decision date also gives you a follow-up point. Without it, follow-up turns into guessing. You either call too soon, or you wait until the customer has already chosen someone else.
Do not chase daily. Follow up once around the date they gave you. Ask whether they have questions about how the quotes compare.
The first clear quote sets the reference
Speed matters because the shop that responds first often becomes the reference point.
The shop that answers, books the visit on the first call, and sends a clear quote when promised gives the customer something to measure the other quotes against. A shop that calls back days later is being compared to a quote the customer already has in hand.
Book the visit on that first call when you can. Give the customer a date for the quote. Then send it when you said you would.
Three quotes may describe three different jobs
Quotes rarely describe the same job. That is why the total at the bottom can mislead a homeowner.
A pattern comes up again and again. A homeowner lays three quotes on the kitchen table. One includes patching and painting the wall afterward. One says “by others.” One never mentions hauling away the old material.
The lowest number may be the one that left the most out. The homeowner cannot tell that from the totals alone.
Make your quote easy to compare. List what is included and what is not included. State who pulls any permits. Spell out cleanup and haul-away. Say who supplies materials, or state the allowance. Give the expected start window and the payment schedule.
Tell the caller on the phone that your quote will spell these items out. Suggest they ask the other contractors the same questions.
The contractor whose quote explains every line is the contractor the homeowner calls back with questions. That call gives you another chance to earn the work.
Let the written scope do the selling
Do not drop your price on the phone before you have seen the job.
You do not know what the work requires. You also do not know whether the other contractor included the same work. Cutting your price early can leave you with a job that does not pay for the time and material it takes.
Do not talk down the other contractors either.
Let the customer compare the work, not just the totals.
Sometimes the right move is to step out
Ask one direct question if the caller keeps focusing only on price:
“Are you choosing the lowest number no matter what?”
If the answer is yes, and your shop is not the cheap option, say so politely. Explain what you price in. Then let the caller decide whether the visit is worth it.
You can say:
“We are not usually the lowest number. Our quote spells out the scope, cleanup, materials, start window, and payment schedule so you know what is included. If that is what you want to compare, the visit makes sense. If you are choosing only the lowest number, we may not be the right fit.”
A polite no early beats a wasted evening.
Bella keeps the first call from going to voicemail
Bella answers every call, day or night, so a shopper does not hit voicemail while dialing the next number on the list.
She works out the job, including the scope, address, budget, and timeline. She can ask when the caller plans to decide. She books the visit on your real calendar while your hands are full and only offers times you can make. The customer gets a confirmation text, and you get a text summary when the call ends.
Bella can give the price range you set. She never quotes a number you did not approve.
On the Growth plan, she has full repeat-caller memory. If that shopper calls back weeks later, she knows who they are and what job they asked about.
Plans are flat monthly prices: Starter is $95, Growth is $295, and Pro is $495. There are no per-call limits, no per-minute meter, and no overage fees.
Use this answer on the next shopping call
When a caller says, “I’m getting three quotes,” do five things.
- Thank them for telling you.
- Ask whether this is their first call or their last, and whether anyone has already visited.
- Ask when they plan to decide and who is deciding.
- Book the visit on that call.
- Promise a clear, itemized quote and give the date it will arrive.
Then keep that promise.
That is how you turn a comparison call into a fair chance to win the work.
Keep reading
- Paying subs in 2026: the 1099-NEC line moved from $600 to $2,000The federal 1099-NEC line for paying subs went from $600 to $2,000 for 2026 payments. You will file fewer forms. You still need the W-9 before the first check.
- What a missed call actually costs your contracting businessWork out the real number for your own shop, using jobs you have already booked this year.
- The nine questions to ask on every remodel callGet budget, scope, and timeline out of a first call without making it feel like an interrogation.
- Voicemail, answering service, or receptionist: what actually fits a contracting shopAn honest comparison of the three ways to handle calls you cannot take, including where each one fails.
- The after-hours call policy every contracting shop needsDecide which calls are worth answering at night, who they go to, and what happens to the rest.
- How to spot a tire kicker on the phone, before you drive outThe signals that separate a serious customer from someone collecting numbers, and how to handle both.
- Should you charge for estimates? A straight answer for contractorsWhen charging wins you better work, when it costs you jobs, and how to introduce a fee properly.
- How many times to follow up with a lead before you let it goA follow-up schedule that keeps slow leads alive without turning you into the shop that will not stop calling.
- 3-day right to cancel for contractors: the FTC Cooling-Off RuleThe contractor's 3-day right to cancel: what to hand over at the kitchen table, when you can cash the deposit, and when the rule does not apply.
- While you're here: how to handle extra work requests without eating the costHow to price and write up the small add-ons customers ask for mid-job, so nobody is surprised at the final invoice.
- How to turn down a job without burning the leadHow to say no to the wrong job so the caller still remembers you well when the right job comes along.
- Why customers stand you up on estimate visits, and how to stop itMost no-shows are booking problems, not customer problems. Fix the booking call and the days before the visit.
- The EPA lead paint rule: what every trade needs to know about pre-1978 homesThe trigger is the age of the house and how much paint you disturb, not your trade. Ask what year it was built before you book.
- The unhappy customer call: how to handle a complaint after the job is doneMost complaint calls are about something small. Silence is what makes them expensive. Call back the same day, sort the problem, and book a real return date.
- Should you give a price over the phone? How to answer 'what will it cost?'Give a range when a few questions and photos can get you close, book a visit when the price hides behind a wall, and write down every number you say.
- The 'my last contractor walked off the job' call: how to take over half-finished workTakeover jobs can be good work. Ask about the old contract, the money, and the permit on the first call, never price them over the phone, and write down what you own.
- The customer wants to buy their own materials: how to say yes without eating the riskCustomer-supplied materials can work, but only with rules set before the job: approve the product, check the boxes before the start day, warrant your labor only, and set a charge for lost days.
- When can you start? How to answer when you're booked weeks outThe hopeful date and the flat 'we're booked out' both lose jobs. Separate the visit date from the start date, tie the range to your real calendar, and tell a wrong-fit caller early.
- 'Are you licensed and insured?': how to answer it on the phoneThe question often comes right before the caller hangs up. Answer it in one specific sentence, name the coverage you carry, and text proof before they put the phone down.
- Collecting the final payment: how to get paid in full when the job is doneThe final check rarely stalls because the customer cannot pay. It stalls over one small item nobody wrote down. Here is how to close out a job and leave with the money.
- How long should an estimate stay good? Setting an expiration date when material prices moveA quote with no end date promises your price and your calendar forever. One line on the estimate fixes that, and it keeps you from an awkward call weeks later.
- What your crew needs to know before the first morning: the handoff from the person who sold the jobThe person who sold the job heard the whole story. The crew lead got part of it. A one-page handoff before day one closes that gap.
- Rain day: what to tell the customer when weather pushes the job backThe customer is almost never upset that it rained. They are upset that they had to call to find out. Here is how to make the weather call first.
- Asking for reviews and referrals: when to ask, how to ask, and what not to doThe best time to ask for a review is the final walkthrough, in person, with a link in a text the same day. Here is the full habit, plus the review rules that trip shops up.
- Job photos: what to shoot before, during, and after every jobThe shop with a before photo of that crack can text it back and the call ends calmly. The shop without one argues from memory. Here is the photo habit that settles it.
- Markup vs margin: why a 20 percent markup is not a 20 percent profit"I put 20 percent on everything" sounds like a 20 percent profit. It is not. Here is the math from the margin you need to the markup you charge, and what a discount really costs.
- Order the materials before you promise the start dateThe start date you give a customer is only as good as your slowest material. Here is how to confirm lead times, order early, and catch a wrong delivery before it stops the crew.
- Working in a lived-in home: the house rules and daily cleanup that keep the customer on your sideMost mid-job calls are not about the work. They are about the dog that got out, the truck in front of the neighbor's mailbox, and the dust on the dining table. Here is how to stop those calls before they start.
- Allowances in an estimate: how to write them so they don't turn into a fightThe estimate said "tile allowance" and a number. Then the customer came back from the showroom. How to write allowances so the overage, the labor, and the deadline are settled before anyone signs.
- When your sub doesn't show up: how to protect the schedule and the customer's trustThe customer finds the empty house before you hear about it. How to confirm subs, build slack into the schedule, and tell the customer first when a trade misses a day.
- Your workmanship warranty: what to put in writing before the jobA spoken promise turns into an argument months later. How to write a short workmanship warranty: one length, one start date, a plain not-covered list, and an inspect-first rule.
- Raising your prices: how to tell past customers without losing themThe hard part of a price increase is the repeat customer who calls and says "same as last time." How to pick a start date, send a short heads-up, and hold the new price calmly.
See it in action
Book a short walkthrough and we’ll show you Bella taking a call for a shop like yours.
Book a walkthrough
15 minutes, no pitch deck.
Or just call us
(628) 895-9788